Ares Strategic Mining Completes Multi Year Drilling Program Planning for Utah Fluorspar Project

A multi-month exploration project identifies over 160 drill targets. Fluorspar anomaly pattern identified and mapped across 13km of Ares’ claims. Fluorspar pipe clusters discovered which indicate strong open pit potential. Company will commission radiometric airborne survey to add definition to discovered trends.   Vancouver, B.C – January 21, 2022 — Ares Strategic Mining Ltd. (CSE: […]

  Ares Strategic Mining Completes Lumps Plant Steel and Infrastructure Fabrication

Company has begun arranging shipping for plant steel and equipment. Steel structures will install alongside Ares’ already shipped lumps plant. Ares’ partners will accompany the steel and equipment to site to assist with installation.   Vancouver, B.C –  January 19, 2022 — Ares Strategic Mining Ltd. (the “Company”) (CSE: ARS) (OTC:ARSMF) (FRA: N8I1), is pleased […]

Ares Strategic Mining Receives Final Assay Results from its Drill Programs to Delineate Fluorspar Mining Targets

Ares discovers large high-grade fluorspar mineralization, at least 60 m down plunge, averaging over 80% pure fluorspar, and is still open at depth. Greater mineralized fluorspar widths and consistent grades compared with first drill program. Large fluorspar mineralized zones found at surface, averaging over 50% fluorspar. High-grade veins found between fluorspar pipes. Every drill hole […]

Ares Strategic Mining Inc. Completes Plant Design and Begins Tendering Process

Vancouver, BC – December 22, 2020 — Ares Strategic Mining Ltd. (“Ares” or the “Company”) (TSXV: ARS) (OTC:ARSMF) (FRA: N8I1), is pleased to announce the Company has completed its engineering design work on the upcoming processing facility to be installed at the mining operation in 2021.   The Company has completed the full Process Design […]

Ares Strategic Mining Inc. Announces Completion of Successful Delineation Drill Program at the Lost Sheep Mine

Ares doubles plant capacity and output plans based on large fluorspar mineralization discovery on its permitted mining area. Following the successful preliminary delineation program, Ares’ delineation program completes 875m of reverse circulation drilling in 10 drill holes. New discovery connects two large known mining sites and expands preliminary mining plan scope. All drill holes have […]

Ares Strategic Mining Inc. Announces the Acquisition of 28 New Claims Showing Fluorspar Mineralization, and the Consolidation of the Spor Mountain Fluorspar District

Ares identifies many additional non-mined fluorspar bearing breccia pipes after following regional ground exploration work which confirmed fluorspar mineralization exposed at surface. Ares consolidates the Fluorspar District by adding the Blue Queen and the Lost Soul prospects. 28 new claims had been added to the Company’s operation, amassing a total of 108 claims covering the […]

Ares Strategic Mining Inc. Announces New Fluorspar Discovery on Its Permitted Mining Area

Ares identifies a new zone of fluorspar mineralization connected to its preliminary mining target. Following the successful Phase 1 delineation program, Ares accelerates its exploration and delineation program and expands its mining targets. The new discovery connects two known mining sites and expands the preliminary mining plan scope. All 5 drill holes within the new […]

Ares Strategic Mining Inc. Announces 1,500m Follow-up RC Drill Program After Confirming Presence of Additional Fluorite Bearing Pipes on its Permitted Area

– Ares identifies more fluorspar targets on its permitted area.   – Company will seek to delineate additional fluorspar mineralization for mining operations.   – Company will launch new drill program Wednesday 9th September for up to 1,500m of RC drilling consisting of between 10-15 drill holes.   Vancouver, BC – September 9, 2020 — […]

Ares Strategic Mining Inc. Completes Delineation Drilling Assaying and Confirms High Grades of Naturally Occurring Fluorspar

Large homogeneous zones of high-grade Fluorspar discovered – suitable for direct shipping to industry without requiring any processing. High grade zones up to 89% purity discovered at Ares’ Lost Sheep Fluorspar Mine. Ares immediately commences mine planning and modelling with assay results. Ares begins plant design and equipment defining.   Vancouver, BC – August 31, […]

Ares Strategic Mining Inc. Is Pleased to Announce the Appointment of Keith Minty, a Senior Mine Builder, to Oversee Its Fluorspar Mine Development, Construction and Commissioning

– Ares appoints Mr. Keith Minty P. Eng. MBA to coordinate the project development, construction, commissioning and operations of the Company’s Lost Sheep Fluorspar Mine.   – Mr. Minty is a past Northern Miner’s “Mining Man of the Year” recipient.   – Mr. Minty has extensive experience leading the construction and commissioning of nine mines […]